Year | Project | Customer |
---|---|---|
2001 | Pervaporation plant for dehydration of different solvent mixtures. Integration into a hybrid process with two rectification columns. | S.A.R. Plus, Bexbach, Germany |
2000 | Membrane separation plant | Chemical Industry, Germany |
1999 | Reverse osmosis plant for boiler feed water production, high pressure steam vessel / turbine. Process design, procurement, project management, site management, commissioning, documentation, training of customer personnel. |
Thames Water Utilities Ltd., Beckton / London, GB |
1998 | Multi stage nanofiltration- / reverse osmosis plant
Process design, procurement, project management, site management, documentation. |
upt GmbH, Saarbrücken, Germany |
1996/97 | Ultrafiltration plant for removal of heavy metals. Process design, procurement, project management, commissioning, documentation, training of customer personnel. |
Wacker-Chemie AG, Nünchritz (former Hüls Silikone GmbH), Germany |
1996/97 | Ultrafiltration plant for preparation of a PVC-suspension. Project management, commissioning. |
Wacker-Chemie AG, Cologne, Germany |
1996 | On respect of customers request, project informations will not be published! Contact for informations: Mr. Bernd Ingber, AGFA Gaevert AG, Tel. 0214/30-57053. |
AGFA Gaevert AG, Leverkusen, Germany |
1995 | Hybrid process (reverse osmosis / ion exchange) for boiler feed water production. Process design, procurement, project management, commissioning, documentation, training of customer personnel. |
KNP Meerssen, Meerssen, NL |
1993/95 | Waste water treatment (hybrid process: biological treatment, ultrafiltration,
nanofiltration, high pressure reverse osmosis) incl.
thermal processing of by-products (thin film evaporator
/ dryer), gas offtake and -recovery at the waste dump
Breitenberg. Process design, tendering, site mangement, project management. |
Werra-Meißner-Kreis, Eschwege, Germany |
1993/94 | Waste water treatment (hybrid process: nanofiltration, high pressure reverse
osmosis) at the waste dump Meiningen. Licencing procedure, process design, tendering, site mangement, project management. |
Landkreis Meiningen, Meiningen, Germany |
1992/93 | Hybrid process (distillation / rectification / membrane separation) for the recovery
of pharmaceutical grade isopropanol. Process design, procurement, commissioning, training of customer personnel, project management. |
SPL Scientific Protein Laboratories, Wisconsin, USA |
1991 | Membrane plant for dewatering of isopropanol. Process design, commissioning, personnels trainee, project management. |
ICI Biospecialities, Newcastle, Australia |
1991 | Membrane plant for the dehydration of an organic solvent. (production of pesticides). Procurement, site management, commissioning, training of customer personnel. |
Sandoz-Agro AG, Muttenz, Swizerland |
1990/91 | Hybrid process (distillation / membrane separation) for recovery of ethyl acetate. Process design, procurement, site management, commissioning. |
AGFA Gaevert AG, Leverkusen, Germany |
1990/91 | Hybrid process (evaporator / membrane separation) for waste water treatment and
recovery of valuable compounds. Procurement, site management, commissioning, training of customer personnel. |
BASF AG für Ruetgers-Nease Chemical Company Inc., State College, Pennsylvania, USA |
1990 | Multi purpose membrane plant for the dehydration of organic solvents. Commissioning and training of customer personnel. |
Bayer AG, Leverkusen, Germany |
1988/89 | Electrodialyses plant for purification of x-ray contrast media. Process design, site management, commissioning, project management. |
Dynamit Nobel AG, Werk Leverkusen, Germany |
1988 | Membrane plant for cleaning of waste gases (removal of chlorinated hydrocarbons,
pilot project). Process design and commissioning. |
Schering AG, Berlin, Germany |
1987/88 | Power station Tobruk: extension and overhaul of the boiler feed water recovery-
and production plant. Supervision and commissioning. |
General Electric Corporation, Tripolis, Libya |
1986 | Membrane plant for the treatment of hydrous organic solvents. Process design, site management, project management, commissioning, training of customer personnel. |
Hüls AG, Troisdorf (former Dynamit Nobel AG), Germany |
1985/86 | Sirte II: multi stage flash evaporator (MSF) for drinking water production incl.
steam boiler / turbine. Process design, procurement, site management, commissioning, training of customer personnel. |
General Electric Corporation Tripolis, Libya |
1979/82 | ARGE MEDA: floatable seawater desalination plant, multi stage vertical tube evaporator
(VTFE) in combination with mechanical vapor compression
and high pressure steam boiler / turbine. Process development, process design, commissioning, co-author of the research report. |
BMFT-Bundesministerium für Forschung und Technologie, Thyssen AG, Germany |